joscha1987
2013-07-10 15:58:08
- #1
Hello!
I have been searching the internet for hours and found a lot of contradictory information, so I wanted to consult your expertise.
It is a 4-story house, building class 4, located in a block development and is to be insulated at the back with an external thermal insulation composite system. It is located in Hamburg!
So far, no problem.
Now the question is what I have to submit to the authority? Up to GBK 3 I can insulate without a permit, but unfortunately that no longer applies.
Do I have to submit a simplified building application? That is a big problem because all the plans of the house were destroyed during the bombing. So everything would have to be remeasured and redrawn just to apply a few centimeters of insulation. Are there other options? And what kind of documents would I then have to submit?
Best regards, Joscha
I have been searching the internet for hours and found a lot of contradictory information, so I wanted to consult your expertise.
It is a 4-story house, building class 4, located in a block development and is to be insulated at the back with an external thermal insulation composite system. It is located in Hamburg!
So far, no problem.
Now the question is what I have to submit to the authority? Up to GBK 3 I can insulate without a permit, but unfortunately that no longer applies.
Do I have to submit a simplified building application? That is a big problem because all the plans of the house were destroyed during the bombing. So everything would have to be remeasured and redrawn just to apply a few centimeters of insulation. Are there other options? And what kind of documents would I then have to submit?
Best regards, Joscha