paulch7
2022-01-01 13:31:50
- #1
Hello everyone, I wanted to install underfloor heating and have partially chipped away the old clinker tiles in the earth-connected basement, they were laid wet back then. The result is a modest floor structure - the floor slab does not have the best consistency, let’s say lean concrete. Can you remove 6-7 cm and then smooth it with cement self-leveling screed? Under the "floor slab" there is coarse gravel/topsoil about 15 cm, then comes wet sand. The construction seems dry at first. Of course, I wouldn’t take tiles as flooring - linoleum or vinyl, but would such a structure hold again? Completely excavating/digging out is too complex/expensive. Regards