Hello forum,

who is responsible for ensuring that the regulations of a development plan are complied with when building "turnkey" (including planning etc.) with a construction company?

The client (as a layperson in construction) or the construction company (as the executing and planning service provider)?

Specifically, it is currently about roof tiles that may not be permitted by the development plan. These were selected by me (client) without (unfortunately) checking the development plan again....

Regards N.
 

€uro

2012-12-22 07:56:16
  • #2
Hello,
The planning authority lies exclusively with the client, i.e., in external relations, he must take responsibility for all effects arising from the construction project.
Since a client is usually not an expert, he delegates to the general contractor / subcontractor, architects, etc. There is then a contractual agreement between the client and the contractor.

The general contractor / subcontractor must deliver a defect-free work. This also includes that the building complies with the development plan requirements.
The general contractor / subcontractor should have pointed out during the selection that the chosen option does not comply with or violates the concerns of the development plan. A negligence on their part.

Best regards
 

Similar topics
10.12.2012Terrain elevations in the development plan are incorrect.12
14.04.2015Uneconomic development plan31
04.05.2015How long is a development plan valid?20
21.12.2017Development plan - 1.5-story building?16
16.02.2016Regulations regarding development plans, any experiences?22
13.06.2016Build an investment property, despite a 1 1/2-story development plan11
14.11.2016Horse chestnut in the development plan13
21.02.2017Development plan difference between ground floor, roof, and single-storey17
20.04.2017Development plan for a multi-family house16
05.10.2017Property / Development Plan / Retaining Walls / Excavations17
28.02.2018Deviation from the development plan in the new construction area is possible118
18.01.2019Development plan: Garage on the boundary outside the building window53
09.07.2018Demolition of existing house - new construction: what does the development plan allow?11
15.08.2018Basic floor area ratio / floor area ratio for plots without a development plan: How to calculate? Experiences?18
15.04.2019Opinions on floor plan design (Iso views, floor plans, development plan)43
27.09.2018Development plan roof shapes / distance - What is allowed?12
07.10.2018Development plan deviations - the neighbors do not want to agree15
30.01.2019Deviations from the development plan clinker - experiences?27
18.04.2019Development plan of 1998 - Setting the eaves height to a maximum of 3.00m12
25.07.2019Bungalow with special development plan ... more ideas?41

Oben