Planning and approval costs for dormer / cross gable

  • Erstellt am 2018-04-15 12:36:43

ddn2702

2018-04-15 12:36:43
  • #1
Hello everyone,

we are planning to install a as wide as possible dormer / gable dormer (approx. 6 meters) facing the garden on the 1st floor of our detached house built in 1998. We have over 3 meters of space on both sides of the property, so distance requirements will not be a problem. The house also stands free, so there is no need to maintain 1.25 meters distance to neighboring buildings.

For the building permit including structural engineering and thermal insulation certification, we have now requested offers from several local architects. Unfortunately, the prices vary greatly, so we are not sure which trend is the "right" one.

Architect 1 offers us the building planning including the approval procedure for €1,500 incl. VAT. The structural engineering and thermal insulation report would have to be provided externally. He estimated around €1,000 for this. So a total of around €2,500.

Architect 2 offers all services from a single source. That is, from planning through approval to structural engineering. However, this seems to be billed by the hour. Approximately 40-50 working hours are estimated at a price of around €4,500 incl. VAT plus additional costs.

Where does the difference of around €2,000 come from? Only the planning of the dormer is to be commissioned. So no complete renovation / refurbishment of the entire building.

Since this is our first contact with architects and this topic, we would very much appreciate some advice.

Have a nice Sunday!
 

Similar topics
23.10.2008We need an architect - or should I do it myself?14
02.01.2009Experiences with architects15
19.03.2013Turnkey or build with architects?19
21.07.2013Cost estimates from two architects differ greatly!10
13.11.2013Do you absolutely need an architect?10
16.12.2013Pre-planning with the architect - is having your own floor plan sensible?18
30.01.2014Architect's cost estimation15
21.08.2014Construction costs when building with architects. What does your experience say?18
11.02.2015Cost planning for a single-family house including land, additional costs, architect32
19.12.2014Finding architects - but how?26
08.09.2015Massive house by the architect, approximate costs?16
23.09.2015Responsibilities of the Architect in Tendering18
29.10.2015Is it normal for the purchase of land to be tied to an architect?16
19.01.2016Construction project with architects31
20.08.2016Should the house be planned by a general contractor or architects?30
10.03.2017Payment of the architect16
12.10.2017Cost of enclosed space. First draft discussed with architects27
27.10.2017Construction description by architects: Who has experience?13
11.07.2018Architects / Civil Engineer Service, Execution Plan, Scope26
13.02.2021Only belief allowed, solutions?82

Oben