Hello everyone,

I have received the following cost breakdown and payment schedule from our general contractor.
We are building 220m² living space on two levels (without a basement), with the ground floor being larger and therefore the flat roof.
Except for the floor coverings, everything is basically included.

Is this okay so far? It is difficult to make the items exact, if you really go into it, you have certainly paid too much. For example, even without a ventilation system, blinds, stairs, and a glued tile, 99% would have to be paid.

Net Gross
Planning and Energy Saving Ordinance Calculation €1,900.00 €2,261.00
Shell construction including earthworks and drainage €85,874.00 €102,190.06
Stair system with railing €8,788.00 €10,457.72
Interior plaster €12,410.00 €14,767.90
Exterior plaster as ETICS €28,989.00 €34,496.91
Carpentry/Roofing/Insulation €20,300.00 €24,157.00
Sheet metal work/flat roof €14,654.00 €17,438.26
Windows with window sills and blinds €29,584.00 €35,204.96
Interior doors/front door €14,348.00 €17,074.12
Screed €8,787.00 €10,456.53
Tiling work €20,521.00 €24,419.99
Floor coverings - € - €
Painting work €9,042.00 €10,759.98
Sanitary/Heating/Ventilation €52,710.00 €62,724.90
Electrical €10,278.00 €12,230.82

Completion of foundation slab €25,000.00 7%
Completion of ground floor ceiling €45,000.00 12%
Completion of upper floor ceiling €40,000.00 11%
Completion of main roof €25,000.00 7%
After window installation €25,000.00 7%
Completion of flat roof €25,000.00 7%
Completion of interior plaster €30,000.00 8%
Completion of screed €20,000.00 5%
Completion of full thermal insulation €30,000.00 8%
Start of tiling work €30,000.00 8%
Completion of heating €30,000.00 8%
After sanitary final assembly €30,000.00 8%
After completion of interior area €20,000.00 5%
Final invoice after acceptance €3,640.00 1%

Total €378,640.00 100%

There is also a 5% security deposit by guarantee.

edit: ah, why is there no table feature here..
 

Similar topics
28.04.2016Order screed - plaster14
18.05.2020Proper Ventilation/Drying of Interior Plaster / Drying Time21
24.04.2017First variable loan, then construction financing?11
05.08.2017Screed necessary? Unfinished but insulated attic23
15.08.2017Calculation interior finishing: heating, sanitary, bathrooms, floor coverings55
27.12.2017Underfloor heating heating demand with at least 60 mm screed30
01.09.2018Offer for heating / sanitary / ventilation - is it realistic?55
29.06.2021Screed with drying accelerator24
25.10.2020Main connection box installed before interior plaster in the utility room20
22.04.2021Costs for the heating & sanitary trade86
07.06.2021Installation of heat pump/heating - before or after screed16
25.02.2022Too much moisture in the single-family house after screed installation? Risk of mold?49
23.02.2022Possible subsidies when replacing an old oil heating system?16
31.03.2022Bright lines on fresh interior plaster - future cracks?27
17.10.2022Heating screed with device vs. with heat pump: costs?19
18.11.2022Heating not available - Who bears the costs?77
24.02.2023What kind of flooring in the utility room on screed - DIY, tiles?34
28.07.2023Screed has been in for three days and is still wet?52
27.11.2023Assessment of costs for the shell construction and total costs (plaster, screed)17

Oben