Pay or wait? (x-% after completion of building application...)

  • Erstellt am 2018-12-13 21:02:26

KSchmidtke

2018-12-13 21:02:26
  • #1
Hello everyone,

according to the contract with our construction company, we have to pay a certain percentage of the construction sum after completion of the building application.

Now the company prepared the building application a week ago, the documents already looked quite complete. However, two documents were missing and should be submitted to the building authority if they wish:

1) Structural safety certificate (statics)
2) Energy certificate

The question is now legally interesting.
x-percent of the construction sum was agreed upon after completion of the building application.

In my opinion, it is not yet completed if the statics have not even been sent to the building authority.

Furthermore, it is theoretically possible that after the review, the clerk finds more documents missing, right?

What do you think? Am I exaggerating? :-D
 

Mottenhausen

2018-12-13 21:16:02
  • #2
I guess you have to pay now, the two components will only be submitted if needed. Detailed structural calculations are (at least in our case) not part of the building notification. The energy calculation is already available with us anyway due to the KfW55 application.
 

nordanney

2018-12-13 23:21:29
  • #3
In my opinion, the building application is finished. I see it like Mottenhausen. The work was done and should also be paid for.
 

KSchmidtke

2018-12-14 00:04:30
  • #4
All right, thanks for the feedback!

Just wanted to be sure :-).
 

Similar topics
15.12.2017Single-family house with stepped floor - Feedback/Discussion/Tips/Ideas49
29.01.2014City villa floor plan / Feedback on static analysis, arrangement28
28.02.2015Building application submitted/open detailed questions/looking forward to suggestions39
15.06.2015Garage - Building Application - Confusion36
16.02.2016Question about contractual completion14
05.07.2018Final costs only after structural analysis and heat demand calculation?12
12.08.2019Relation Construction sum / Financing - Survey24
18.09.2019Build the garage yourself - Calculate the statics?28
16.12.2019What is the cost of the structural analysis for a single-family house?24
07.05.2020Statics/Energy Saving Ordinance Is the offer fair?14
30.11.2020Building Authority Problems - Purchased a Defective Plot56
04.01.2023Retaining wall 2 m high without static report?10
05.08.2020Building a garden shed... Is a building permit necessary? Detours?17
30.01.2021The building authority rejects the building application because the house is planned too far back86
26.03.2021Building with different stones than in approval planning and structural analysis12
08.10.2021Building application: What happens next?16
09.05.2022Building application due to parking spaces not approved. What can happen?30
03.03.2023Building permit application without height survey?15
10.03.2023Preliminary building approval positive, building application criticized position29
24.11.2024Building authority requires open space design plan for single-family house - experiences?37

Oben