Hello,
according to our soil report, our soil class is between 4-7. Due to the hillside location, quite a lot has to be excavated. Is there a possibility to monitor the excavation? I want to avoid the company later claiming that, for example, 150m3 instead of the actual 50m3 of soil class 6 was excavated and removed.
Anyone have any ideas or personal experience with this? Thanks!
according to our soil report, our soil class is between 4-7. Due to the hillside location, quite a lot has to be excavated. Is there a possibility to monitor the excavation? I want to avoid the company later claiming that, for example, 150m3 instead of the actual 50m3 of soil class 6 was excavated and removed.