the following situation:
The shell is just finished and the roof is covered.
I have two floors to overcome. The first staircase already exists, as it is a concrete staircase. The second staircase, which runs above the first, is only temporarily built. A formwork was also made for this, as originally a concrete staircase was supposed to be made there as well. However, I have decided at short notice to install a wooden stringer staircase without risers here, so that more light can come through.
Now the temporary structure must be removed, as the interior plasterer is coming.
What could I install now and how? I think the final staircase will come only after the screed?
Or could the staircase builder already install the final stringers now and only fit the steps with temporary treads, so that the screed and the rest can be done?
Every other temporary solution seems very elaborate to me?! Or is there something from, for example, scaffolders?
the following situation:
The shell is just finished and the roof is covered.
I have two floors to overcome. The first staircase already exists, as it is a concrete staircase. The second staircase, which runs above the first, is only temporarily built. A formwork was also made for this, as originally a concrete staircase was supposed to be made there as well. However, I have decided at short notice to install a wooden stringer staircase without risers here, so that more light can come through.
Now the temporary structure must be removed, as the interior plasterer is coming.
What could I install now and how? I think the final staircase will come only after the screed?
Or could the staircase builder already install the final stringers now and only fit the steps with temporary treads, so that the screed and the rest can be done?
Every other temporary solution seems very elaborate to me?! Or is there something from, for example, scaffolders?