benkler1401
2018-09-05 12:27:31
- #1
Hello everyone, I need to lay underground cable and paving stones for about 1.5m in a corner of the garden. I have already removed the paving stones and wanted to go 60cm deep. The problem is that I hit concrete after just 10cm and that along the entire length. Also, the gardener laid the underground cable under the lawn and that is definitely not 60cm. I estimate it is about 20cm. The question now is, does anyone have an idea or a tip? Maybe use a rigid conduit? Use [Fränkisches m25 leerroh r]? I still have some left over from construction. I am concerned that if I break up the concrete, the edge stones will no longer hold properly and I would then have the problem of finding the garden (lawn) connection again. Thanks. Best regards