EveundGerd
2015-01-24 23:55:46
- #1
Hello everyone,
As part of our house construction, Telekom brought a cable that is laid in the supply/drainage trench by our excavator together with the various pipes.
There was a note to please pull the cable through an extra conduit.
Our excavator has now laid the cable in the trench without pulling it through a conduit.
The trench is already half (30 m) completed and closed again.
It was noticed because I asked my husband how the cable was laid. He doesn’t think it’s serious either. He does not want to open the trench again.
In my opinion, the excavator simply forgot it.
Therefore my questions: leave it as is or better to open it again?
Will Telekom complain?
As part of our house construction, Telekom brought a cable that is laid in the supply/drainage trench by our excavator together with the various pipes.
There was a note to please pull the cable through an extra conduit.
Our excavator has now laid the cable in the trench without pulling it through a conduit.
The trench is already half (30 m) completed and closed again.
It was noticed because I asked my husband how the cable was laid. He doesn’t think it’s serious either. He does not want to open the trench again.
In my opinion, the excavator simply forgot it.
Therefore my questions: leave it as is or better to open it again?
Will Telekom complain?