Hi, can you help me understand what KFW considers as construction costs in their program 153?
I found out that the kitchen is not included.
What about bathroom fittings, toilet... washbasin etc.
Electrical installation: lamps, etc.
Establishing house connections (electricity, water, telephone)
Background: I have taken out a full financing of 300K for a total of 3 residential units, thought everything was included.
It would be great if you could help me.
Thank you.
I found out that the kitchen is not included.
What about bathroom fittings, toilet... washbasin etc.
Electrical installation: lamps, etc.
Establishing house connections (electricity, water, telephone)
Background: I have taken out a full financing of 300K for a total of 3 residential units, thought everything was included.