Hello everyone,
I will soon have the task of building a pre-wall toilet, which is to be tiled. Now the question arises, since I am supposed to double-board;
How is it with the depth settings of the supply / wastewater and the manual operation?
With the double boarding, everything sits about 13mm further outwards?
A console from [Fa. Geberit] is to be used.
I will soon have the task of building a pre-wall toilet, which is to be tiled. Now the question arises, since I am supposed to double-board;
How is it with the depth settings of the supply / wastewater and the manual operation?
With the double boarding, everything sits about 13mm further outwards?