Hello everyone,
I would like to apply for the new house connections but am a bit confused.
After we received the building permit, the architect created the drainage plan and submitted it to the municipality (but have not yet received a response).
Do I need to apply separately for the wastewater/drainage connection, or is the application of the plan sufficient?
The architect has planned a rainwater retention system (this is a requirement from the municipality, as far as I understand). Do I have to commission this separately myself? Is it part of the drainage connection work?

I also received a letter from the municipality about water and drainage, but it only referred to the building permit and not to the sewer plan. It mentioned the costs for the water and drainage system and that we should report them after the construction work is completed.
Are these the fees for the water/wastewater connections?

From the general contractor, I learned that the electrician will apply for the electricity connection for the new house.
Do I need to coordinate anything for the various house connections (water, wastewater, electricity & internet)?
We will start with the foundation slab next week. Should something be done at this phase or only after the shell construction is completed?
Thank you very much
Best regards
I would like to apply for the new house connections but am a bit confused.
After we received the building permit, the architect created the drainage plan and submitted it to the municipality (but have not yet received a response).
Do I need to apply separately for the wastewater/drainage connection, or is the application of the plan sufficient?
The architect has planned a rainwater retention system (this is a requirement from the municipality, as far as I understand). Do I have to commission this separately myself? Is it part of the drainage connection work?
I also received a letter from the municipality about water and drainage, but it only referred to the building permit and not to the sewer plan. It mentioned the costs for the water and drainage system and that we should report them after the construction work is completed.
Are these the fees for the water/wastewater connections?
From the general contractor, I learned that the electrician will apply for the electricity connection for the new house.
Do I need to coordinate anything for the various house connections (water, wastewater, electricity & internet)?
We will start with the foundation slab next week. Should something be done at this phase or only after the shell construction is completed?
Thank you very much