All earthworks. From my point of view, it is not much either. The property slopes 1 meter over 25 meters. Strip foundations with frost skirts are planned. As extras, I like good floor coverings, such as parquet, granite, and marble in all rooms, but we are getting those sponsored. For example, I don't need a wood stove; I've been cured of that.
 

ypg

2016-03-19 22:18:44
  • #2
Uh,
Firstly: everything that does not need to be financed because it is given as a gift counts as equity. In this case, it is probably to be recorded as own contributions, which leads to better conditions.
Topic earthworks: No, certainly _not_ all earthworks are included. Costs for earthworks can range from 3000 to 30000. A construction service description has a limit, usually 30cm... In your case, your gradient already exceeds the limit.
But you shouldn't care about what a small home builder calculates for you.
No construction company agrees to as many own contributions as you imagine.
Here the family, there the friends... The friends surely also want to be paid?!
In your case, it makes sense to build an architect-designed house and build freely, then you can award the trades to whoever you want.

However, the additional costs for a single-family house do not become lower, after all, your insurance and property tax come in annually.
 

Grym

2016-03-20 09:24:13
  • #3
Building insurance and property tax are transferable, i.e. already included in the additional costs, if the landlord is not stupid and has not forgotten it.
 

ypg

2016-03-20 10:04:55
  • #4


Yes, you're right... I just looked it up again.

Nevertheless, the OP talks about 400 euros, and I think you should also calculate with these costs for a single-family house.
 

Pandrion

2016-03-20 14:53:30
  • #5
I think the discussion about what the house costs and the question whether the financing is feasible should first be separated. Otherwise, this won't work.

1) 400,000€ with your income, without knowing other key data like debts etc., is realistic for now. We have a household income of 4,500€, two children, and have financed 325,000€. It works perfectly. You should just make sure that the bank installment plus additional costs do not exceed 1/3 of the household income. I find that a good rule of thumb. Here it is also best to get advice from the house bank (not some financial experts).

2) We have enough experts, architects here regarding the house costs. I’ll stay out of that as a simple builder. I can only say that we are building 170m2 in the Hannover area for 249k€ including all materials. Without basement/garage. We contribute labor ourselves for painting, insulating the roof, and laying the floor. Or rather, we did.
 

Similar topics
26.08.2012Small single-family house, little equity but good income, is it at all feasible?11
28.01.2013House construction costs single-family house from 180 sqm11
10.04.2013Is financing for a single-family house feasible?20
19.11.2014Financing single-family house - How much can we afford?47
03.02.2014Cost estimate single-family house with garage11
19.03.2015Planning a single-family house with a general contractor or architect or similar28
04.03.2016Additional costs KfW55 experiences21
18.05.2016Additional costs when purchasing a plot of land - property tax?55
22.02.2017Is a single-family house possible for 180k €?38
13.04.2018Property tax overturned by the Federal Constitutional Court16
16.05.2018Preparation of monthly additional costs. Can I find something like this somewhere?27
12.06.2018Rough cost estimate of a single-family house with an architect12
14.04.2020Feasibility Single-family house + land 400,000 €89
15.05.2020Additional costs after building the house52
20.04.2021Project: Single-family house with double garage at the Lower Rhine12
18.09.2020Financing a single-family house with land subdivision - risk or opportunity?46
13.04.2021Construction costs single-family house estimate by sqm or volume10
30.08.2021Bungalow with basement for single-family house with 60m2 office, is it reasonable?23
29.04.2022Designing hillside property - Earthworks / Retaining wall cost options26
10.04.2025Estimate of construction costs for a single-family house in the Tübingen area105

Oben