Our foundation slab should be constructed according to the WU guideline. Trenches were excavated, shuttered, mats installed, and concrete poured.
- Is it correct if the frost barrier and foundation slab are cast in one pour?
- Drying of the slab causes stresses. If both components are connected, the likelihood of cracks is surely much higher?
Is the construction company allowed to build according to the WU guideline, or must it be specified in the contract (for us according to the Building Code)?
In addition, the exterior walls were started the next day. Is the drying time sufficient?
Our foundation slab is approximately 18 cm thick. Due to unevenness, in the worst case only 15 cm.
Where can I find the relevant regulations?
Thanks to you!
- Is it correct if the frost barrier and foundation slab are cast in one pour?
- Drying of the slab causes stresses. If both components are connected, the likelihood of cracks is surely much higher?
Is the construction company allowed to build according to the WU guideline, or must it be specified in the contract (for us according to the Building Code)?
In addition, the exterior walls were started the next day. Is the drying time sufficient?
Our foundation slab is approximately 18 cm thick. Due to unevenness, in the worst case only 15 cm.
Where can I find the relevant regulations?
Thanks to you!