Hello everyone,
after the summer break, the single-family house construction project is set to start. That’s why we have received an offer from our main contractor for the earthworks, which we can assign to him but do not have to. Of course, it would be somewhat easier from a coordination perspective to get everything from one source. But the prices should also be "within range."
Since I cannot really evaluate the prices well, I would appreciate your feedback. Here I have selected the 8 largest individual items (all prices are net):
What do you say – are the indicated prices okay? By the way, the construction is taking place in southern Baden-Württemberg.
Thanks for your support!
Regards,
matze007
after the summer break, the single-family house construction project is set to start. That’s why we have received an offer from our main contractor for the earthworks, which we can assign to him but do not have to. Of course, it would be somewhat easier from a coordination perspective to get everything from one source. But the prices should also be "within range."
Since I cannot really evaluate the prices well, I would appreciate your feedback. Here I have selected the 8 largest individual items (all prices are net):
Site setup | 402.50 EUR |
Delivery and installation of construction fence | 8.10 EUR / running meter |
Topsoil removal 20 cm | 1.00 EUR / m² |
Excavation of channels soil class 2-6 | 20.70 EUR / m³ |
Backfilling of working areas with excavated material, including compaction | 17.30 EUR / m³ |
Backfilling with screened rubble, including delivery and compaction | 20.70 EUR / ton (factor cbm>to = 1.8) |
Graveling of access road, including delivery and compaction | 24.20 EUR / ton (factor cbm>to = 1.8) |
Excavator hour | 86.30 EUR / hour |
What do you say – are the indicated prices okay? By the way, the construction is taking place in southern Baden-Württemberg.
Thanks for your support!
Regards,
matze007