Hi everyone. Quick question for the electricians among you.
The plasterer is basically just about to start, but the electrician is not finished yet. I would like to know how much time an electrician (master) would need for the following tasks and conditions. Of course, I know that this cannot be generalized, but a rough estimate would be sufficient since I have no idea at all and cannot assess it in the slightest.
Single-family house with approx. 210 m² floor area. Completely single-story. (old barn).
- approx. 300 sockets and switches including Sat and network
- installation of supply line from an existing electrical cabinet and installation of electrical cabinet incl. fuses etc.
The flush-mounted boxes are all plastered in and all chases are made. Therefore, "only" all cables need to be pulled.
How many hours could be assumed for this?
The plasterer is basically just about to start, but the electrician is not finished yet. I would like to know how much time an electrician (master) would need for the following tasks and conditions. Of course, I know that this cannot be generalized, but a rough estimate would be sufficient since I have no idea at all and cannot assess it in the slightest.
Single-family house with approx. 210 m² floor area. Completely single-story. (old barn).
- approx. 300 sockets and switches including Sat and network
- installation of supply line from an existing electrical cabinet and installation of electrical cabinet incl. fuses etc.
The flush-mounted boxes are all plastered in and all chases are made. Therefore, "only" all cables need to be pulled.
How many hours could be assumed for this?