Salus_86
2018-10-17 11:04:54
- #1
Actually a minor matter. Nevertheless, I wonder who has to bear the costs mentioned above?
I am building with the free allocation of the individual trades. I obtain the building materials from a regional wholesaler. Today, the concrete for the floor slab was poured. Now it was said that I have to bear the cost for cleaning the concrete mixer. However, this is not included in the offer. It states "ready-mixed concrete" price X, "concrete pump base price" price X, "concrete delivery performance" price X/CBM. Nothing else.
I am building with the free allocation of the individual trades. I obtain the building materials from a regional wholesaler. Today, the concrete for the floor slab was poured. Now it was said that I have to bear the cost for cleaning the concrete mixer. However, this is not included in the offer. It states "ready-mixed concrete" price X, "concrete pump base price" price X, "concrete delivery performance" price X/CBM. Nothing else.