Good evening everyone,
after we bought our plot last year and it is now fully developed, we are now entering into discussions with various construction companies.
Our ideas have since become more concrete, so now the right company needs to be found. The first meeting has already taken place. I would now ask you to estimate the price for the following construction project:
- Baden-Württemberg - Heilbronn area
- Sloping plot: 2-3m slope on 28m plot
- Basement: room height 2.50m: 55sqm apartment + 40sqm cellar rooms (technical, laundry, ...)
- Ground floor: room height 2.75m: 97sqm living area
- Upper floor: room height 2.50m: 93sqm living area + small balcony
additional double garage 42sqm
rough specifications:
- aluminum windows
- high-quality vinyl in all rooms except wet rooms, here 60x60cm tiles
- fireplace
- heat pump + solar
- walls with painted woodchip wallpaper
The first estimate from a local construction company (I would describe them as a "premium" developer) was 560k-600k for the house plus 80k additional costs (outdoor area, earthworks, all fees, etc...).
Is that market price or does the company charge accordingly for their very good reputation and high standard?
Best regards
ivenh0
after we bought our plot last year and it is now fully developed, we are now entering into discussions with various construction companies.
Our ideas have since become more concrete, so now the right company needs to be found. The first meeting has already taken place. I would now ask you to estimate the price for the following construction project:
- Baden-Württemberg - Heilbronn area
- Sloping plot: 2-3m slope on 28m plot
- Basement: room height 2.50m: 55sqm apartment + 40sqm cellar rooms (technical, laundry, ...)
- Ground floor: room height 2.75m: 97sqm living area
- Upper floor: room height 2.50m: 93sqm living area + small balcony
additional double garage 42sqm
rough specifications:
- aluminum windows
- high-quality vinyl in all rooms except wet rooms, here 60x60cm tiles
- fireplace
- heat pump + solar
- walls with painted woodchip wallpaper
The first estimate from a local construction company (I would describe them as a "premium" developer) was 560k-600k for the house plus 80k additional costs (outdoor area, earthworks, all fees, etc...).
Is that market price or does the company charge accordingly for their very good reputation and high standard?
Best regards