Hello everyone,
Our house construction company glued the foil at the ceiling to the wall. The connection points do not seem very neat to us, so that the intended insulation might not be fully achieved.
It is the first upper floor and above it come plasterboard panels. Above that is the attic and then the hipped roof.
We would very much appreciate your opinion.
Thanks in advance.